WO-26-0133
On the floor Machining52 × SA-V152-AST-50 — S Type adjusting stud sub-assembly — 152 mm, 50 Shore A
Short on 1 component
Planned
Materials ready
On the floor
QA & pack
Complete
What it consumes
What has to be on the shelf before this can run.
| Part number | Stage | Needed | Issued | On hand | Lot |
|---|---|---|---|---|---|
| MLD-V152-50 Isoflex co-polymer moulding — 152 mm body, 50 Shore A | Moulding | 52 | — | 24 28 short | PL-26-2160 |
This cannot run until the shortfall is covered. Availability will say whether those components can
themselves be made up out of what is on the shelf — a moulding machined into a sub-assembly, most often.
Open availability
Works order
- Makes
- 52 × SA-V152-AST-50
- Kind
- Machining
- Work centre
- CNC 1
- Time booked
- 26 min
- Per piece
- 30 s each
- Where
- Coomera Works
- Raised
- 07 Aug 2026
- Due
- 15 Aug 2026 · in 7 days
- Completed
- —
- Owner
- Tyson Blakely
- Value at list
- $12,081