WO-26-0136
Planned Machining58 × SA-V203-BDN-70 — B Type bolt-down sub-assembly — 203 mm, 70 Shore A
Short on 1 component
Planned
Materials ready
On the floor
QA & pack
Complete
What it consumes
What has to be on the shelf before this can run.
| Part number | Stage | Needed | Issued | On hand | Lot |
|---|---|---|---|---|---|
| MLD-V203-70 Isoflex co-polymer moulding — 203 mm body, 70 Shore A | Moulding | 58 | — | 13 45 short | — |
This cannot run until the shortfall is covered. Availability will say whether those components can
themselves be made up out of what is on the shelf — a moulding machined into a sub-assembly, most often.
Open availability
Works order
- Makes
- 58 × SA-V203-BDN-70
- Kind
- Machining
- Work centre
- CNC 1
- Time booked
- 29 min
- Per piece
- 30 s each
- Where
- Coomera Works
- Raised
- 03 Aug 2026
- Due
- 17 Aug 2026 · in 9 days
- Completed
- —
- Owner
- Tyson Blakely
- Value at list
- $17,702