WO-26-0157
Complete Assembly35 × IFV203-DCPM24-70-ZP — Isoflex Dual compression mount — 203 mm, M24, 70 Shore A, zinc plated
Planned
Materials ready
On the floor
QA & pack
Complete
What it consumes
What actually came off the shelf, and the lots it came from.
| Part number | Stage | Needed | Issued | On hand | Lot |
|---|---|---|---|---|---|
| SA-V203-DCP-70 Dual compression sub-assembly — 203 mm, 70 Shore A | Sub-assembly | 35 | 35 | 12 | PL-26-2259 |
| HW-AST-M24-250-ZP Adjusting stud M24 × 250 mm — zinc plated | Bought-in | 35 | 35 | 0 | — |
| HW-TPL-203-ZP Top plate — 203 mm mount, zinc plated | Bought-in | 35 | 35 | 37 | — |
| HW-LKN-M24-ZP Locknut M24 — zinc plated | Bought-in | 70 | 70 | 210 | — |
Works order
- Makes
- 35 × IFV203-DCPM24-70-ZP
- Kind
- Assembly
- Work centre
- Assembly bench 2
- Time booked
- 1 h 24 min
- Per piece
- 2.4 min each
- Where
- Coomera Works
- Raised
- 30 July 2026
- Due
- 04 Aug 2026 · 4 days ago
- Completed
- 08 Aug 2026
- Owner
- Nate Villani
- Value at list
- $17,878