MR-26-0085
Pouring T-C11480MLD-C114-80 — Isoflex coupling element moulding — 114 mm PCD, 80 Shore A · Coomera Polymer Moulding
8 / 26
accepted against the run over 4 pours · 1 scrapped at the tool (88.9% yield)
18 to go
at 2 a day, about 9 more days — around 16 Aug 2026
Poured to the run, not to a quantity. Whatever comes off the tool that day gets booked in against it.
What came off the tool, day by day
This is the shape the mould shop actually delivers in.
Pours
4 booked in| Date | Poured | Accepted | Scrapped | Lot | Operator | Note |
|---|---|---|---|---|---|---|
| 29 July 2026 | 3 | 3 | — | — | W. Tulloch | — |
| 28 July 2026 | 3 | 3 | — | — | S. Rennick | — |
| 27 July 2026 | 1 | 1 | — | — | D. Kovac | — |
| 26 July 2026 | 2 | 1 | 1 | — | W. Tulloch | One short-filled, scrapped at the tool. |
The run
- Moulding
- MLD-C114-80
- Mould shop
- Coomera Polymer Moulding
- Tool
- T-C11480
- Ordered
- 26 pieces
- Rate
- 2 a day off this tool
- Durometer
- 80 Shore A
- Opened
- 24 July 2026 · 15 days ago
- Target
- 10 Aug 2026
- Closed
- —
- Raised by
- MT
Where these go
45 of MLD-C114-80 on the
shelf at Coomera. Each one is about a short job on
the CNC away from being a machined sub-assembly, and a few minutes after that from being a finished mount.
Book in today's pour
Goes straight onto the shelf under its own lot. The run stays open.