SO-26-0575
ShortMackay Port Engineering · their PO PO99524 · wanted 15 Aug 2026 (in 7 days) · Kylie Prentice
12 short on 1 line
Some of the shortfall cannot be covered from what is on the shelf. The lines below say how far it gets and what is capping it.
Moulding
0
MLD-V152-75
30 s each
Sub-assembly
31
SA-V152-BDN-75
1.5 min each
Finished
0
IFV152-BDNM24-75-SS
=
Can ship today
0
on the shelf, plus what is a few minutes away
Lines
Reservation is per line, not per order.| Part number | Qty | Allocated | Reservation | Lot | Unit | Line | |
|---|---|---|---|---|---|---|---|
| SA-V063-CYL-50 Cylindrical sub-assembly — 63 mm, 50 Shore A List | 15 | 15 | Firm | PL-26-2264 | $119.87 | $1,798.05 | |
| SA-V090-CYL-55 Cylindrical sub-assembly — 90 mm, 55 Shore A List | 10 | 10 | Firm | — | $156.10 | $1,561.00 | |
| IFV254-ASTM20-45-ZP Isoflex S Type adjusting stud mount — 254 mm, M20, 45 Shore A, zinc plated List | 14 | 14 | Firm | PL-26-2406 | $590.07 | $8,260.98 | |
| IFV152-BDNM24-75-SS Isoflex B Type bolt-down mount — 152 mm, M24, 75 Shore A, 316 stainless List | 12 | 0 12 short | Firm | — | $447.46 | $5,369.52 |
Lines ex GST$16,989.55
Freight$240.00
GST 10%$1,722.96
Total$18,952.51
Gross margin $7,918 · 46.6%
Order
- Customer
- Mackay Port Engineering
- Contact
- Wendy Kirkpatrick
- Raised
- 22 July 2026
- Wanted
- 15 Aug 2026 · in 7 days
- Ship from
- Coomera Works
- Ship to
- 1 Mulherin Drive, Mackay Harbour QLD
- Terms
- 30 days
- Currency
- AUD
- Despatched
- —