Isoflex
Isoflex
SO-26-0586 Demo Pilbara Power Systems · Short
08 Oct 2026

SO-26-0586

Short

Pilbara Power Systems · their PO PO96243 · wanted 22 Aug 2026 (47 days ago) · Kylie Prentice

Print

7 short on 1 line — and all of it is in the building

The finished stock is not there, but the parts to make it are. 13 min of machining and bench work covers the lot, and every stage moves against its own lot number.

IFV075-LMMM20-50-SS wants 7, 0 allocated, 7 short 13 min of work
Moulding
50
MLD-V075-50
24 s each
Sub-assembly
0
SA-V075-LMM-50
1.5 min each
Finished
0
IFV075-LMMM20-50-SS
=
Can ship today
7
on the shelf, plus what is a few minutes away

Lines

Reservation is per line, not per order.
Part numberQtyAllocated ReservationLotUnitLine
SA-V063-GPM-65
General purpose sub-assembly — 63 mm, 65 Shore A
List
15 15 Firm PL-26-2285 $126.19 $1,892.85
IFV075-LMMM20-50-SS
Isoflex Light machinery mount — 75 mm, M20, 50 Shore A, 316 stainless
List
7 0
7 short
Firm — $266.66 $1,866.62
Lines ex GST$3,759.47
Freight$160.00
GST 10%$391.95
Total$4,311.42
Gross margin $1,729 · 46.0%

Order

Customer
Pilbara Power Systems
Contact
Damien Ackroyd
Raised
08 Aug 2026
Wanted
22 Aug 2026 · 47 days ago
Ship from
Coomera Works
Ship to
9 Coolawanyah Road, Karratha WA
Terms
30 days
Currency
AUD
Despatched
—